Virtual Move and Data Migration Strategy

With a firm belief that success is the result of thorough planning, TDS relies on a systematic approach to migrating physical hardware to a virtualized environment (P2V), and moving existing virtual hosts onto more redundant and scalable infrastructures (V2V).

Our approach consists of 3 phases:

Phase 1

  • Your current environment is documented and audited for CPU load, memory thresholds, bandwidth utilization, energy consumption, and a number of other critical host resources.
  • Environment needs are analyzed with the client to construct the proper next generation virtual infrastructure.
  • Current capacity requirements, security, and future growth are considered, and a framework strategy is designed.
  • Once the strategy is approved, hardware and software is sourced and purchased.

Phase 2

  • Hardware for new virtualized destination environment is installed.
  • Physical to virtual migrations are conducted on existing test candidates.
  • Successful migration of test candidates to the virtual environment is verified by TDS and client staff.

Phase 3

  • Utilizing best of breed technologies, along with expertise gained from numerous successful migrations, conversion of physical machines to virtual machines begins.
  • Existing virtual machines are migrated to new hardware and improved resources.
  • End to end performance and reliability testing is conducted to ensure complete success.
  • If tests find unacceptable performance or other issues, rollback to physical or original virtual guests is available and can be performed quickly.